
| Number Of Turbines | 6 |
| Turbine Type Model | Gamesa G114 - 2.1 MW |
| Installed Power | 2,6 MWm / 10 MWe |
| Location | Karaçayır Köyü Mevkii , Merkez / SİVAS |
| License No/Date | EÜ/3272-1/1978 14.06.2011 |
| Capacity Factor | % 34 |
| Estimated Annual Generation | 35.000.000 kWh |
| Karaçayır WPP Date of Provisional Acceptance 1 (T1-T2-T3-T4) | 08.09.2016 |
| Karaçayır WPP Date of Provisional Acceptance 2 (T5-T6) | 01.10.2016 |